Step 1
Ensure that the elevation and the location of the anchor bolts are correct
as shown in PICTURE 1 and PICTURE 1A below.

PICTURE 1

PICTURE 1A
Step 2
Place columns in area of base location and
stand them up (PICTURE 2 and PICTURE 2a)). Shim base plate to
plumb column and tighten anchor bolt nuts
.
PICTURE 2

PICTURE 2a
Step 3
Install a 2x6 or a 2x8 wall as shown in the building
drawings-click here.
Use 2 pc--1/4"x 2-1/2" carriage bolts. A treated
sill should be used at the bottom row in each bay as shown in
picture 3
below.

PICTURE 3
Step 4
When installing the
Econospan structure ,on piles or piers, a 2x10 on 16 ' bay or a
2x12 on 20' bay should be installed vertically on the bottom girt , flush
to the outside face--as shown below in PICTURE 4. This will prevent
the girt line from sagging

PICTURE 4
Step 5
Install mid-span girt blocking using
two nails per end as show in
P
icture 4A

PICTURE 4A
Step 6
Install trusses as shown in PICTURE 5 below:

PICTURE 5
Step 6a
Install truss and end wall beams as shown in
PICTURE 5A and 5B below.

PICTURE 5 A

PICTURE 5B
Step 7
Install 2x10 or 2x12 roof purlins as per
building plans. 2pcs.--1/4" x 2-1/4" carriage bolts
are required at each end and install the truss bottom bracing as
shown in pictures 6
and 7 below.

PICTURE 6

PICTURE 7
Step 8
Install Gable end 2x6 as shown in PICTURE
8.

PICTURE 8
Step 9
Install wall bracings as shown in
PICTURE 9. Attach ends to bolts as
shown in PICTURE 9A Drill 2" hole through wall girts on the
bracing line as in PICTURE 9B
.
PICTURE 9

PICTURE 9A

PICTURE 9B
Pass cable through holes to create straight line and
tighten turnbuckle until building columns are plumb as in
PICTURE 10.
After building is plumb, re-check each column for plumb.

PICTURE 10
Step 10
Install roof bracing and tighten turnbuckles
until building becomes square on roof as shown in PICTURE 11 below Measure center of corner
column to center of other corner Column measurement should be equal.

PICTURE 11
Step 10A
Frame man doors in wood or steel as shown below

Step 11
Install overhead door frames and wood trim as
shown in pictures on drawing-CLICK HERE.
Step 11a
Insulate behind trim before cladding goes on, as shown in
PICTURE 11a

PICTURE 11A
Step 12
Install 2 x 6 overhead door track backing as
shown, then install overhead door trim as shown below.

Door weather stripping will cover the gap as
shown below.

Click here for man door
details.
Click here for window framing
Step 13
Install base starter trim as shown in the
picture12below:

PICTURE 12

PICTURE 12A
Step 14
Install wall cladding. Ensure that sheets are
plumb. PRE drill holes in cladding with 1/8" drill bit. Stack 10 sheets on
top of one another to drill same pattern. Use 1st sheet as pattern for
rest of sheets.
Step 15
Install J trim, door trim and top trim around openings as
shown in the pictures below. For drawing details--click
here:

Corner Extension

Top and side of overhead door

Interior corner

Window Trim
Step 16
Install eave trim.
Step 17
Install roof cladding pre drill holes as in
wall cladding.

Step 18
Install caulk tape between roof sheets.
Ensure tape is on the high rib and straight.
Step 19
Install gable trim.
Step 20
Install roof cap with foam closures. Ensure
closures are installed under cap edge for straight appearance.

Step 21
Install corner caps as shown in the drawing--click
here.
Step 22
Ensure all bolts are installed and tightened!
Step 23
Site clean-up and finial inspection.